Specific paperwork needed forallD14 filings: The paperwork thatmaybe required depending on scope: The time between application submission and permit issuance depends on the method of review. Benjamin Prosky, Assoc. Final inspections must be performed by a registered design professional in good standing with the DOB. 0000098695 00000 n That might sound like a presidential order from a spy movie, but Directive 14, created by the Department of Buildings in 1975, is a way of obtaining a C of O revision without going through the entire C of O rigmarole. 0000005846 00000 n You cannot apply Dir 14 to an Alt 1 or New Building NB Application. Instead, the DOB inspection division performs the final construction inspection, confirming the work was completed in accordance with the approved Directive 2 plans. A final inspection report complying with the requirements of section 28-116.2.4.2 of the Administrative Code shall be filed within thirty (30) days of the date of the final inspection that enables the inspector to attest that the work is substantially compliant with the approved construction documents, the building code, and other applicable laws Confirm that all Energy Code requirements are met. Directive 14 is not allowed on an Alteration Type 1 Place of Assembly for 75 people or more Place Of Assembly for Restaurants and Bars with 75 or more occupants Any space with 75 or more occupants will require a Place of Assembly Filing. There are two primary methods: standard plan examination and directive 14. Directive 14, Contact us with any questions or comments, Zoning Reform Opens Doors for New Businesses and Housing in Arlington County, How to Meet Compliance with FISP and Local Law 126 Parking Structures, How to Meet Local Law 97's 2024 Decarbonization Deadline, Directive 14 was implemented in 1975 to streamline the filing process by allowing applicants of record to file for a, Directive 2 was also implemented in 1975, allowing applicants to file projects. Permits, Such self-certified inspections may be audited; audit results will be provided to applicant and must be resolved prior to final sign-off. 0000003228 00000 n For questions or concerns on how these requirements may affect your properties, please contact the New York office of Milrose Consultants by calling 212-643-4545 or clicking the Contact Us button below. xref 0000004703 00000 n AIANY understands the budgetary concerns within DOB, and the desire to expedite processes. DOB inspections may be required during various project stages. 0000001768 00000 n Directive 14, Call us at 212.643.4545 or visit our contact pageto send us a message, Milrose Consultants | Copyright 2022 | Privacy Policy, Back to Basics: An Overview of Directive 14 Filings, Contact us with any questions or comments, Zoning Reform Opens Doors for New Businesses and Housing in Arlington County, How to Meet Compliance with FISP and Local Law 126 Parking Structures, How to Meet Local Law 97's 2024 Decarbonization Deadline, PW3 Cost Affidavit (DOB fees are typically 1% of total project cost), C Required Items Checklist, for demolition and general construction self-certifications, POC-1 Professional and owner certification, for self-certification only (all project types), TR8 Technical Report Statement of Responsibility for Energy Code Progress Inspections, for general construction and mechanical work, TM1 Application for Plan Examination, for fire alarm work, PW4/ EUP Equipment Use Application, for using heavy machinery. 2023 All Rights Reserved, NYC is a trademark and service mark of the City of New York, Project Guidelines: Skilled Trade/Registrant, NYCECC Tables C403.2.3(1)through C403.2.3(7)and Table C404.2, Sidewalk Caf: Allowable Work Without a Registered Design Professional, Project Phases & Requirements for Registrant, Dampers integral to building envelope: outdoor air dampers, HVAC & Service Water heating equipment: meets sizing and efficiency requirements as per 2016, HVAC & Service Water heating system controls: applicable part-load, reset, temperature controls as per, Piping insulation: minimum thickness of 1 to 4.5, required on piping carrying fluids >105F as per, Interior lighting power: Installed lighting shall be verified for compliance with lighting power allowance per, Exterior Lighting Power: Installed lighting shall be verified for compliance with source efficacy and/or the lighting power allowance as per, Lighting controls: Each type of required lighting controls shall be verified and tested for functionality and proper operation as per, Maintenance Information - shall be furnished for installation of new equipment as per, Permanent Certificate - shall list type and efficiency of heating, cooling, and/or service water heating systems as per.